Homes and housing in steel framing, ready in months

SmartBrix builds houses and housing projects with a steel structure fabricated to ±0.5 mm (±0.02 in) and a hurricane design verified per project up to 250 km/h (155 mph), Saffir-Simpson Category 4. We deliver turnkey, from the BIM model to dry assembly, in Colombia and Panama, and handle inquiries from the Caribbean.

Summary · Steel framing housing
  • Hurricane design verified per project up to 250 km/h (Cat. 4), made for the coast and the Caribbean.
  • Dry construction up to 90% faster than traditional construction.
  • Up to 30% less construction waste on your lot.
  • Zn-Al-Mg 275 g/m² steel, specified against corrosion in coastal climates.
01 · The system

Why build your home in steel framing.

A house that is fabricated before it is built: industrial precision, a light structure, and comfort specified layer by layer.

Each house starts as a BIM model. It arrives on the lot as a kit of cold-formed steel (LGS/CFS) members, CNC-cut to ±0.5 mm. That precision changes the build: walls arrive square, building services run through openings planned at the design stage, and finishes sit on flat surfaces, without the adjustments and waste of wet construction. The complete system, from profile to facade, is documented on the steel framing construction page.

The steel structure is also much lighter than traditional masonry and concrete. Less weight means smaller foundations and less mass to mobilize during an earthquake. For tropical and coastal climates, the profiles use Zn-Al-Mg 275 g/m² steel (ZM275 to EN 10346 / ZMM275 to ASTM A1046), specified against corrosion, and the hurricane design is verified per project up to 250 km/h (Category 4). SmartBrix applies these criteria to its projects in Colombia and Panama, and to the Caribbean inquiries it handles, designed to NSR-10, REP-2021, or IBC, depending on the jurisdiction.

Comfort is designed too. Every wall is specified layer by layer (exterior cladding, thermal and acoustic insulation, and interior finish) according to the climate and the use of each room, and defined in the BIM model before fabrication. Because the system allows long spans, the architecture gains freedom: open plans, future additions, and facades tailored to the design. SmartBrix delivers the house turnkey, from design and permits to finishes. It is backed by 350+ PEB Corp Group projects executed by SmartBrix Construction; the documented cases are in the project portfolio.

02 · Advantages

Six advantages for your home.

What steel framing solves in a house, with the system's figures.

  • 01
    Dry-construction speed

    The structure is fabricated at the plant while foundations go in, and on site it is only assembled. Projects typically take 3–5 months from foundations, with a process up to 90% faster than traditional construction.

  • 02
    Hurricane design verified per project

    Hurricane design verified per project up to 250 km/h (Category 4), made for the Caribbean coast and the region's storm zones.

  • 03
    Zn-Al-Mg 275 g/m² corrosion protection

    Zn-Al-Mg 275 g/m² steel profiles, specified to resist corrosion in tropical and coastal climates.

  • 04
    Thermal and acoustic efficiency

    Layered wall assemblies defined in the BIM model: thermal and acoustic insulation specified room by room, before the first profile is fabricated.

  • 05
    Less waste on your lot

    Components arrive cut to size from the plant: up to 30% less construction waste, and a cleaner, safer lot during the build.

  • 06
    Non-combustible structure

    Steel is a non-combustible material: unlike timber structures, the skeleton of the house adds no combustible load to the building.

Foundation slab pour on site

Foundations on site · the slab is poured before the structure is dry-assembled

03 · Gallery

Structure, building services, and cladding: the real process of a steel-framed house.

Group plant Coil decoiler and roll-forming line at the group plant
Building services Plumbing and electrical rough-in inside the walls of a steel framing house
Cladding Exterior cladding applied over the structure of a house built in steel framing
MEP Electrical and plumbing systems integrated in the structure of a prefabricated house
04 · Fact sheet

System, wind resistance, and timelines for a steel-framed house.

The data you need to evaluate the industrialized option against traditional construction.

System
Steel framing: cold-formed steel (LGS/CFS), CNC-fabricated to ±0.5 mm
Wind resistance
Hurricane design verified per project up to 250 km/h (Saffir-Simpson Category 4)
Codes
NSR-10 (Colombia) · REP-2021 (Panama) · IBC · RETIE (Colombian electrical code) · AISI S100
Typical timeline
Typically 3–5 months from foundations, depending on design and finishes
Delivery model
Turnkey: BIM design and engineering, steel fabrication at the group plant (NewCon Steel®), civil works, erection, and finishes under one contract
05 · Frequently asked questions

Frequently asked questions about steel-framed houses.

Is a steel-framed house safe in hurricanes and earthquakes?
Yes, when the structure is designed for your site. Each structure has a hurricane design verified per project up to 250 km/h (Category 4) and is calculated to the code of its jurisdiction: NSR-10 (the Colombian earthquake-resistant building code) in Colombia and REP-2021 in Panama, with cold-formed members to AISI S100. The steel structure is also lighter than traditional construction: less mass to mobilize during an earthquake and lower loads on the foundations.

The quoted wind speed is a design reference, not a universal building rating. Site-specific calculations, exposure, anchorage, connections, and envelope requirements must be verified for each project.

How much does a steel-framed house cost?
The cost depends on the architectural program: area, number of stories, design, finishes, and building systems. For that reason we do not publish a price per m² for housing: request a proposal with quantities. Reply within 24 business hours · technical proposal / quote in 48 h. If you only need an indicative structural cost (steel structure only, MEP and civil works not included; Panama 2026 reference), see the 2026 reference table on the Steel Framing page.
How long does it take to build a steel-framed house?
Typically 3–5 months from foundations. While foundations go in on the lot, the structure is fabricated in parallel at the group's CNC plant, and on site it is only dry-assembled: a process up to 90% faster than traditional construction, with up to 30% less construction waste. The final schedule depends on the design, the area, and the level of finishes.
Does the steel in a steel-framed house rust on the coast?
The profiles are made of Zn-Al-Mg 275 g/m² steel (ZM275 to EN 10346 / ZMM275 to ASTM A1046), specified to resist corrosion in tropical and coastal climates; it is the group standard for projects in the Caribbean. Coastal-city reference: Corporación Universitaria de la Costa in Barranquilla, Colombia, with 2,900 m² (about 31,200 sq ft) delivered in 3 months.

Your steel-framed house, ready in months.